Sound Transit Maintenance of Way (MOW)

Bahnmiller Construction erected the Maintenance and Operations Facility for Sound Transit in Seattle, Washington. We worked as part of the design build team with FORMA Construction Company to create a custom sheet metal design not typically supplied by Pre-Engineered Metal Building (PEMB) manufactures. In addition we worked with the envelope to achieve a blower door test with a very low tested leakage of 0.118 cfm/sf. This new two-building facility supports 35+ vehicles and 80+ personnel for the Tack, Facilities and Power Departments of light rail operations. The facility also includes administrative offices of the MOW and Police staff, fabrication area, parts storage, training rooms and locker rooms. Bahnmiller Construction is proud to have partnered with Sound Transit and FORMA Construction Company on this project.

Owner: Sound Transit

General Contractor:FORMA Construction Company

Location: Seattle, WA

Contract Value: $860,000

Completion: April 2016

Delivery Method: Design/Build

Size: 34,175 sqft

Building Manufacturer: Metallic Building Co.

Insulation System: Liner System in Roof
R-Seal® in Walls